The first PV power plant installation was completed in Turkey.
The first roof project was realized in Romania.
A total of 15 MW capacity project approval was received in Turkey.
The first CIS Glass-Glass panel project installation was completed.
Smart Solar Technologies started the factory construction process in an area of 23.500 m² in Gebze.
The 300 solar power plant projects completed were approved by TEDAŞ.
Smart Solar Technologies signed a strategic partnership with SUMEC Group, one of the leading global companies in the solar industry, in PV cell production.
The solar panel factory established in Gebze started production with a capacity of 420 MW.
The installation of the world's second largest GLASS-GLASS panel solar power plant project has been completed.
PV panel production capacity was increased to 800 MW.
German and Ukrainian offices opened.
Smart Holding was established.
Mass production of Bifacial and Half-Cut panels started.
PV panel production capacity was increased to 1200 MW.
Smart Güneş Teknolojileri Pazarlama A.Ş. and Smart Güneş Enerjisi Teknolojileri ARGE Üretim San ve Tic. A.Ş. were merged and all the engineering capabilities were transfered to Smart Güneş Enerjisi Teknolojileri ARGE Üretim San ve Tic. A.Ş.