2014

The first PV power plant installation was completed in Turkey.
The first roof project was realized in Romania.

2015

A total of 15 MW capacity project approval was received in Turkey.
The first CIS Glass-Glass panel project installation was completed.

2016

Smart Solar Technologies started the factory construction process in an area of 23.500 m² in Gebze.
The 300 solar power plant projects completed were approved by TEDAŞ.
Smart Solar Technologies signed a strategic partnership with SUMEC Group, one of the leading global companies in the solar industry, in PV cell production.

2017

The solar panel factory established in Gebze started production with a capacity of 420 MW.
The installation of the world's second largest GLASS-GLASS panel solar power plant project has been completed.

2018

PV panel production capacity was increased to 800 MW.

2019

German and Ukrainian offices opened.
Smart Holding was established.
Mass production of Bifacial and Half-Cut panels started.

2020

PV panel production capacity was increased to 1.200 MW.

2021

Smart Güneş Teknolojileri Pazarlama A.Ş. and Smart Güneş Enerjisi Teknolojileri ARGE Üretim San ve Tic. A.Ş. were merged and all the engineering capabilities were transfered to Smart Güneş Enerjisi Teknolojileri ARGE Üretim San ve Tic. A.Ş.

2022

The shares of Smart Solar Technologies are traded on the Borsa İstanbul Stock Exchange as of March 24, 2022. SMRTG
Dilovası Solar Module Production Factory was opened and production started.
Listed among the 100 Fastest Growing Companies in BIST100.
Construction continues for solar cell and module production at the Aliağa Solar Cell & Solar Module Integrated Production Facility.
Total PV production capacity of Gebze Production Factory and Dilovası Solar Module Production Factories was increased to 1.700MW.